 Look at where it is now! 2nd story above garage and main house is coming to life. IT's easier to conceptualize the lay out with walls, windows, rooms and ceilings built. It's raw, but there are some details coming out on garage and seamless fit of all posts and glue lams. 
|
|
 In the last 9 days we've made solid progress. Driveway was laid down, power was hooked up, garage slab was poured, sub floor framed, plumbing and HVAC installed, East and North garage and master bath walls framed and sub floor rolled out. I've been nailing, cutting and installing the easy stuff and taking over the grunt work when I can. I brought Miley and Dreyson out for a look today and found some wood to climb and plywood to jump off of. The footprint of the home looks much bigger now with the floor in and a few walls up. Attention to detail is what I've picked up the last few days. Mace who owns and runs Mountain View Construction is getting it done like his shirts say, "Nailing it in Truckee"
updated photos click here

|